Pascal and Francis Bibliographic Databases

Help

Search results

Your search

kw.\*:("Sumisión (compromiso)")

Document Type [dt]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Publication Year[py]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Discipline (document) [di]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Language

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Author Country

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Origin

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Results 1 to 25 of 142

  • Page / 6
Export

Selection :

  • and

How to reply to referees' comments when submitting manuscripts for publicationWILLIAMS, Hywel C.Journal of the American Academy of Dermatology. 2004, Vol 51, Num 1, pp 79-83, issn 0190-9622, 5 p.Article

Facilitating bid evaluation in public call for tenders: a socio-technical approachBANA E COSTA, Carlos A; CORREA, Emerson C; DE CORTE, Jean-Marie et al.Omega (Oxford). 2002, Vol 30, Num 3, pp 227-242, issn 0305-0483Article

Präqualifikation und Regie co-intéressée : Neue VSS-Empfehlungen = Prequalification and Regie co-interessee : new VSS recommandationsARNOLD, A.Strasse und Verkehr. 1996, Vol 82, Num 10, pp 509-511, issn 0039-2189Article

Präqualifikation im Nationalstrassenbau : Stellenwert und Auswirkungen = Prequalification in main road construction : value and consequencesDANZEISEN, V.Strasse und Verkehr. 1996, Vol 82, Num 10, pp 512-514, issn 0039-2189Article

Instandsetzungsarbeiten ― Kriterien für die Planung und Ausschreibung = Travaux de réparation. Critères de planification et soumissionSCHULZ, R.-R.Betonwerk und Fertigteil-Technik. 1987, Vol 53, Num 8, pp 574-582, issn 0373-4331Article

Simplified tender documents, giving an unambiguous representation of the finished building = Documents simplifiés du marché des travaux donnant une représentation conforme du bâtiment après achèvementWAHLSTROM, O.Building research and information. 1991, Vol 19, Num 5, pp 311-314, issn 0961-3218Article

Grundzüge des öff. Beschaffungswesens = Basics of public procurement = Les traits principaux de la soumissionMARAZZOTTA, Lorenzo.GWA. Gas, Wasser, Abwasser. 2005, Vol 85, Num 9, pp 717-724, issn 1018-760X, 8 p.Article

Risk management in engineering construction: implications for project managers = Gestion du risque en génie civil: implications pour les gestionnaires de projetHAYES, R. W; PERRY, J. G; THOMPSON, P. A et al.1987, 36 p., isbn 0-7277-1203-9Book

TU-/GU-verträge: submissionsrechtliche aspekte = TU-/gU-contracts: legal aspects of tendering = Cotrats TU/GU : Aspects juridiques du droit de soumissionRECHSTEINER, Peter.GWA. Gas, Wasser, Abwasser. 2001, Vol 81, Num 7, pp 439-442, issn 1018-760XArticle

Outsourcing of minor material purchasingFOLEY, P. W.Asia Pacific oil & gas conference. 1998, pp 393-398Conference Paper

Technische Spezifikationen und Gewährleistungs-bedingungen im Rahmen der europäischen Ausschreibung : Ansprüche der Gasversorgungs-unternehmen an die Hersteller, dargestellt am Beispiel Balgengaszähler = Technical specifications and guarantee conditions with the framework of the European call for tenders : Demands of the gas supply enterprises on the manufactures, exemplified by a diaphragm meterWERNEKINCK, U.Gas- und Wasserfach. Gas - Erdgas. 1996, Vol 137, Num 4, pp 161-172, issn 0016-4909, 10 p.Conference Paper

Rechnerunterstütze Konfiguration und automatisierte Angebotserstellung für komplexe Produkte = Computer-aided configuration and preparation of tender documents for industrial goodsKOCH, R; KÖRSMEIER, R.Konstruktion (1981). 1994, Vol 46, Num 7-8, pp 255-260, issn 0720-5953Article

Der neue ET-Rahmenvertrag der Deutschen Bahn AG = Deutsche Bahn concludes new framework contracts for EMUsGERLAND, Bettina; REISINGER, Andreas; ALBRECHT, Ingo et al.ETR. Eisenbahntechnische Rundschau. 2012, Vol 61, Num 7-8, pp 69-71, issn 0013-2845, 3 p.Article

Change: Project & Legal PerspectivesLEGGE, Nigel; SUTTIE, Iain.T & T international. 2010, Num DEC, pp 42-45, issn 1369-3999, 4 p.Article

A multi-unit tender award process : The case of TransantiagoMUNOZ, Juan Carlos; MOLINA, Diego.European journal of operational research. 2009, Vol 197, Num 1, pp 307-311, issn 0377-2217, 5 p.Article

Constraint-based clustering model for determining contract packages of bridge maintenance inspectionCHENG, Ying-Mei; LEU, Sou-Sen.Automation in construction. 2008, Vol 17, Num 6, pp 682-690, issn 0926-5805, 9 p.Article

Incorporating project specific criteria anc client utility into the evaluation of construction tenderersHOLT, G. D; OLOMOLAIYE, P. O; HARRIS, F. C et al.Building research and information. 1994, Vol 22, Num 4, pp 214-221, issn 0961-3218Article

To tender, re-negotiate or partner: strategies for contracting service companiesGOULDIE, T. A.Asia Pacific Oil & Gas Conference. 1994, pp 55-80Conference Paper

Ethics in contract performanceRAMAKRISHNAN, R.Journal of the Institution of Engineers. India. Civil Engineering Division. 2003, Vol 84, Num mai, pp 51-56, issn 0020-336X, 6 p.Article

E-tenderin in the gas industryCURRY, Nigel.International gas engineering and management. 2002, Vol 42, Num 5, pp 6-7, issn 1465-7058Article

Perceptions and management of the risks in tendering for refurbishment work = Perception et gestion des risques des marchés de travaux de réhabilitationQUAH LEE KIANG.Building research and information. 1991, Vol 19, Num 6, pp 356-359, issn 0961-3218Article

Vorbefassung und Ausstandspflicht : Empfehlungen zu zwei Stolpersteinen im öffentlichen Beschaffungswesen = Prior involvement and withdrawal obligation : Recommendations for two stumbling blocks in public procurement = Prévention et récusation : Comment éviter ces deux écueils dans l'adjudication des marchés publicsLUTZ, Daniela.GWA. Gas, Wasser, Abwasser. 2005, Vol 85, Num 9, pp 725-731, issn 1018-760X, 7 p.Article

Univ. requirements for manuscripts submitted to biomedical journalsSaudi medical journal. 1991, Vol 12, Num 6, pp 443-448, issn 0379-5284Article

Le nuove regole del gioco = New game's rules = Les nouvelles règles du jeuMALFANTI, V.Strasse und Verkehr. 1997, Vol 83, Num 4, pp 160-162, issn 0039-2189Conference Paper

Contractor selection : qualification and bid evaluationRANKIN, J. H; CHAMPION, S. L; WAUGH, L. M et al.Canadian journal of civil engineering (Print). 1996, Vol 23, Num 1, pp 117-123, issn 0315-1468Article

  • Page / 6